AQW 54475/22-27
- Awaiting answer
- Written
- Priority
To ask the Minister for the Economy to detail any plans she has to introduce regulation for the cost of home heating oil.
View on the NI Assembly website (AQW 54475/22-27) (opens in a new tab)
Alliance Party MLA for Lagan Valley
Every written and oral question David has tabled to Executive ministers and the Assembly Commission since 8 September 2022, with the answers.
David’s profile on the NI Assembly website (opens in a new tab)About this site
Showing the 20 most recent of 264 questions.
To ask the Minister for the Economy to detail any plans she has to introduce regulation for the cost of home heating oil.
View on the NI Assembly website (AQW 54475/22-27) (opens in a new tab)
To ask the Minister for Infrastructure in respect of the tendering of the A1 Junctions Phase 2 scheme, to detail (i) how far the process has gone; and (ii) the remaining stages in the process.
View on the NI Assembly website (AQW 53980/22-27) (opens in a new tab)
To ask the Minister for Infrastructure to detail any indicative timetable for works on the A1 Junctions Phase 2 scheme.
View on the NI Assembly website (AQW 53979/22-27) (opens in a new tab)
To ask the Minister for Infrastructure whether there are any requirements for (i) land purchases; and (ii) vesting, to deliver the A1 Junctions Phase 2 scheme.
View on the NI Assembly website (AQW 53978/22-27) (opens in a new tab)
To ask the Minister for Infrastructure to detail any indicative budget for the A1 Junctions Phase 2 scheme.
View on the NI Assembly website (AQW 53977/22-27) (opens in a new tab)
To ask the Minister for Infrastructure to detail (i) where the A1 Junctions Phase 2 scheme is placed on the order of priority of road projects; and (ii) any projects which are currently placed before this scheme.
View on the NI Assembly website (AQW 53976/22-27) (opens in a new tab)
To ask the Minister of Finance whether the Investment Strategy will include capital investment in (i) Regional; and (ii) Sub Regional, Stadia such as Casement Park and the Northern Ireland Football Fund.
View on the NI Assembly website (AQW 53275/22-27) (opens in a new tab)
To ask the Minister for Communities for an update on the delivery of the Northern Ireland Football Fund.
The three strands of the Northern Ireland Football Fund are progressing as follows:
Performance Programme
The Department is currently subject to a Judicial Review relating to the process used to identify the prioritised cohort of applicants selected to be taken forward in the performance programme. Nevertheless, my officials continue to progress the programme while awaiting the outcome of those proceedings.
This prioritised cohort is currently progressing through the Outline Business Case 1 (OBC1) stage, with legal due diligence also ongoing. All OBC1 submissions are due to be received by the Department by the end of October 2026, when they will then be taken through the Departmental approval process. Whilst no decision on funding has been made at this stage, I remain committed to progressing the performance programme at pace.
Grassroots Programme
On 30 September 2026, I announced the seven applicants that will progress to the next stage of the Grassroots Facilities Programme Pilot. My officials will now engage with these applicants to complete the required due diligence process.
National Football Centre
My Department also continues to work closely with the Irish Football Association on the development of a National Football Centre. The Department has determined that the project demonstrates value for money and the next steps required to bring forward this important project are underway.
Progress is being made across all three strands of the Northern Ireland Football Fund, with due diligence, business case development and project planning activity continuing to ensure that public funding is invested appropriately and delivers lasting benefits for football across Northern Ireland.
View on the NI Assembly website (AQW 53274/22-27) (opens in a new tab)
To ask the Minister for the Economy whether provision for plug-in microgeneration, up to 800w, is included in the suite of legislation and regulations currently in preparation in her Department.
My Department is considering the implications of regulatory changes recently introduced in Britain in relation to plug-in microgeneration, specifically plug-in solar panel systems.
The existing electricity safety regulations, introduced by the former Economy Minister Arlene Foster, do not permit plug-in solar devices to be used here. My officials are examining the legislative changes required to facilitate the safe and straightforward use of compliant plug-in solar microgeneration devices by consumers in the North. My Department is progressing this work as quickly as practicable and intends for amending regulations to be laid by the end of February 2027.
My officials will continue to engage constructively with NIE Networks, the UK Department for Energy Security and Net Zero and other relevant Departments and stakeholders throughout this process to ensure that future arrangements for plug-in solar maintain appropriate standards of electrical safety, consumer protection and network integrity.
View on the NI Assembly website (AQW 52636/22-27) (opens in a new tab)
To ask the Minister for the Economy to detail (i) any assessment that has been made of the SSE Airtricty standard gas unit rate increase of 18.97 per cent from 1 October 2026; and (ii) any action she is taking to mitigate the impact of this price increase on customers.
I am concerned about the impact that recent energy price increases, including gas price increases, over which we have no control, will have this winter, particularly for those on lower income or in vulnerable households.
Unfortunately, the continuing geopolitical conflicts, across the world, are driving the increases that consumers here are seeing in their cost of energy.
The Utility Regulator scrutinises every element of regulated electricity and gas tariff increases, including reviewing wholesale prices to ensure the tariff fairly reflects the cost of supply.
While data published by the Utility Regulator shows that average annual electricity and gas bills here remain lower than those in the south of Ireland and in Britain, it is important to ensure households benefit fully from cost of living supports. My officials are delivering the Household Electricity Discount Scheme (HEDS) which will be a payment of £63 to all domestic households applied automatically through electricity suppliers from 6 October, without the need for an application.
I encourage consumers to make use of the Consumer Council website to help them to make informed decisions on buying their energy, whether it’s natural gas, heating oil or electricity.
View on the NI Assembly website (AQW 52635/22-27) (opens in a new tab)
To ask the Minister of Agriculture, Environment and Rural Affairs for an assessment of the Office for Environmental Protection’s advice on the latest proposals for a revised Nutrients Action Programme.
Answered in the Assembly Chamber on 28 September 2026. Extract from the Official Report (Hansard), including any supplementary questions:
Mr Muir
I welcome the detailed advice and recommendations that I received from the Office for Environmental Protection (OEP) in its response to the consultation on the proposed measures in the revised nutrients action programme (NAP). My Department is carefully considering those recommendations alongside all the other consultation responses. I asked the stakeholder task and finish group, with representatives from the agriculture, environmental and agri-food sectors, to develop proposals that are evidence based, workable at farm level within realistic time frames and meet legislative requirements. I truly appreciate the time and effort that have gone into that process. However, the OEP has raised issues that need to be considered and that will lead to changes to the final NAP proposals. It is imperative that we protect the environment and adhere to the law. Findings from the OEP that non-compliance with nitrogen limits may be widespread and that potentially 1,990 farms may be exceeding that limit are deeply concerning and must be addressed, as must the need to reform slurry exports, as I warned about on 10 June 2025. My officials are working closely with the OEP and stakeholders to finalise the measures in the NAP. I will consider those before taking my final decisions on the updated NAP regulations.
Mr Honeyford
I thank the Minister for his response. Can the Minister set out what the consequences for Lough Neagh will be if agricultural pollution is not addressed?
Mr Muir
The consequences are twofold. They are catastrophic, frankly. If we do not address the issues that I have warned the House about repeatedly, we will have a significant issue when it comes to the long-term viability of farming and our international reputation, which we rely upon for trade. We also face the complete and utter collapse of our waterways. It is imperative that we take those decisions. I commend the stakeholders for the work that they have done, and I commend the OEP for its response. I will consider that in the time ahead. We must take action to address the issue, deliver long-term viability and recognise the great work that has been done by farmers to date and the need to go further.
Ms Finnegan
Minister, how are you ensuring that any revised requirements are practical and properly supported for small farmers?
Mr Muir
As I set out, the criteria for the stakeholder group were very clear. We must strive for that, but we also must abide by the law. When we talk about the rule of law, in this role, my focus is not just on criminal law but on environmental law, and it is important that we abide by that. Alongside that, we must support our farmers in the journey ahead, and part of that is about the funding that we are providing, particularly through the sustainable farm investment scheme, the sustainable catchment programme and that Shared Island funding and wider initiatives. I am committed to doing that so that we can ensure that we have a strong and viable future for farming while improving water quality in our rivers, lakes and loughs.
Mr Wilson
There has been plenty of talk in the House today about not going back. Can the Minister confirm that there will not be any going back to the unworkable and unfair NAP proposals, and, as Agriculture Minister, will he ensure that he will protect that industry and work with it constructively to reach a fair settlement that protects the environment and, crucially, the farmer?
Mr Muir
I work night and day to achieve a future that is thriving and resilient and is environmentally sustainable for farming. That is hard, because the challenges are immense, but I am committed to doing that. We want to see measures that are workable at farm level within realistic time frames, but we also want to meet our obligations under the law. The Member will be aware of the previous and current legal challenges against my Department. I need to be mindful of that.
View on the NI Assembly website (AQO 3996/22-27) (opens in a new tab)Official Report for AQO 3996/22-27 (opens in a new tab)
To ask the First Minister and deputy First Minister for an update on the review of the Strategic Investment Board.
The report into the review of the Strategic Investment Board (SIB) was finalised in 2025. The review recognised the important role that SIB plays in providing specialist expertise to support investment planning, infrastructure delivery and the effective implementation of major projects and programmes across the public sector. It also concluded that SIB’s future role should be considered in light of the Executive’s priorities and made a number of recommendations in that regard.
Following the review, we have provided strategic direction to SIB to support a more robust approach to delivery and a stronger focus on strategic infrastructure investment. SIB has since refocused its business model to align more closely with Executive priorities and to maximise its strategic contribution to the delivery of key investment and infrastructure objectives.
Officials have worked with SIB to develop a strategic implementation plan to take forward the review’s recommendations. That work is continuing, with officials and SIB working closely together to shape SIB’s future role and ensure it remains well placed to support the Executive’s long-term investment and infrastructure priorities.
View on the NI Assembly website (AQO 3944/22-27) (opens in a new tab)
To ask the Minister for the Economy to outline any action her Department is taking to ensure electricity grid capacity does not act as a barrier to economic investment.
Answered in the Assembly Chamber on 14 September 2026. Extract from the Official Report (Hansard), including any supplementary questions:
Dr Archibald
Ensuring that electricity grid capacity does not act as a barrier to economic investment is a priority for me and my Department. Through the grid development monitoring group, my Department brings together key stakeholders to drive progress on strategic transmission and distribution projects and to identify barriers to delivery. In addition, my Department is working closely with NIE Networks, the System Operator for Northern Ireland (SONI) and the Utility Regulator to support major network investment, including the £2·27 billion RP7 programme to increase network capacity and resilience. I have also introduced reforms to electricity connection charging arrangements, making it fairer and more affordable for homes and businesses to connect to the network. Together, those actions will help ensure that the electricity network can support business investment, economic growth and job creation across the North.
Mr Honeyford
Thank you, Minister, for your answer. ABO Energy is a major European renewables company with headquarters in my constituency of Lagan Valley. It has £1·1 billion of investment to come here but cannot realise it, half because of constraints on the grid. That is not just an energy problem; it is a problem for our economy. Does the Minister agree that it is one thing to have meetings and talk to all the stakeholders, but it is her Department's responsibility to produce a plan for moving forward that gives the outworking of how NIE Networks, SONI and the Utility Regulator will realise that, in much the same way as the Department for Infrastructure —
Madam Principal Deputy Speaker
OK. Thank you, David.
Mr Honeyford
— would do for roads?
Dr Archibald
I thank the Member for his question and for his considerable interest in energy policy, which I really do appreciate. We have discussed the issue on a number of occasions. Later in the year, I will publish the energy strategy policy statement, which will set out the key milestones for delivery to 2030. The statement will recognise that we need to be smarter and have a stronger and more flexible electricity grid for the exact reasons that the Member has laid out: supporting economic growth, attracting investment and increasing our renewable electricity generation. We will look at how the various pieces of work by the stakeholders across the energy system fit together, because alignment is important to achieve the outcomes that we are all collectively trying for.
Mr Kearney
Minister, businesses in rural areas already have to contend with many more obstacles than businesses in urban areas. How will you ensure that rural businesses specifically are not disadvantaged when seeking grid connections?
Dr Archibald
I thank the Member for his question. One of the key reasons why we took the decision that we did on connection charging policy was to address the unfairnesses in the existing system, particularly for rural businesses, which often faced much greater costs. Under the previous arrangements, customers in areas where the grid was weaker could face significantly higher costs where reinforcement of the wider network was required. The new arrangements that are now in place spread those costs more fairly across the customer base and make it easier and more affordable for homes and businesses, particularly in rural areas, to connect to the grid. They help remove that unfair geographic penalty and deliver greater fairness regardless of location. As I said, that is particularly important for making a more level playing field for rural businesses. We have had positive feedback, but obviously it takes time to see the impact of some of the changes. The investment by NIE Networks in the grid will play an important part in addressing some of the challenges that we face.
Mr Harvey
Minister, when do you intend to publish the long-duration energy storage policy?
Dr Archibald
I thank the Member for his question. We will publish the storage policy before the end of the year. I cannot give a firm date — I will check with officials — but it is being finalised, and we will publish it before the end of the calendar year.
Madam Principal Deputy Speaker
Doug Beattie is not in his place.
View on the NI Assembly website (AQO 3892/22-27) (opens in a new tab)Official Report for AQO 3892/22-27 (opens in a new tab)
To ask the Minister of Agriculture, Environment and Rural Affairs to outline the progress being made in implementing the Lough Neagh Action Plan.
Answered in the Assembly Chamber on 7 September 2026. Extract from the Official Report (Hansard), including any supplementary questions:
Mr Muir
Of the 37 actions in the plan, 23 have been delivered, and 14 are actively progressing. I remain committed to driving forward the delivery of the remaining actions at pace. Progress to date reflects coordinated efforts across key themes, including scientific research; enhanced monitoring and enforcement; education and stakeholder engagement; regulatory reform; and strategic communications. Consultation on an updated nutrients action programme concludes today. There is also £49 million of funding from the Shared Island Fund to support farmers with nature-based solutions. I am doing all that I can to improve water quality, but tough decisions are needed to secure investment in waste water. I still await approval from the Executive in relation to stronger regulation of and enforcement in sewage pollution. Whilst important strides have been made, it is important to recognise that the recovery of the lough requires sustained, long-term action and leadership in taking those difficult decisions, which I am looking for.
Mr Honeyford
I thank the Minister for his answer. Will the Minister give an update on his efforts to bring the lough's bed and soil into community or public ownership?
Mr Muir
Thank you, David. Last month, I requested and had a meeting with the Earl of Shaftesbury to discuss the ownership of the bed and soil of Lough Neagh. The option for the transfer of the bed and soil, without charge, to public ownership was discussed. Community ownership was noted as presenting significant challenges, given the scale of the lough and the range of interests within the catchment, but it was also recognised that it should not be ruled out as a long-term goal. As we know, Lough Neagh is also of strategic importance to drinking water security, and, naturally, that must influence future ownership and governance arrangements. I have written to the Infrastructure Minister today to request a meeting about transferring the bed and soil of Lough Neagh to Waterways Ireland, NI Water or the Department for Infrastructure. This is an important opportunity, and I hope that it can be seized.
Mr K Buchanan
Minister, in your answer, you referred to how you are doing all that you can on water quality. In May, in a constituency beside mine, six to 10 sheep, one calf and 20 to 30 lambs were dumped in a river. No farmer dumps animals in a river, so, in my eyes, whoever did that is not a farmer. Those animals are still in that river, affecting both it and a river that flows through my constituency and goes into Lough Neagh. Therefore, you are not doing all that you can for water quality, because those animals are still in that river and polluting it. What will you do to address that issue?
Mr Muir
We all, including you, have a responsibility to encourage anyone who has any information associated with that crime to report it so that we can bring the offenders to justice, because it is wrong and deplorable. I have asked officials to consider what more we can do to have a coordinated response to that, and they are taking forward work on a wider coordinated response. Ultimately, a crime has been committed. Someone is culpable, and the veil of secrecy needs to end. People need to report it to the official agencies to ensure that the guilty person goes in front of a court.
Mr McGlone
Minister, this year again, we have seen the proliferation of blue-green algae on the lough. What measures are being or have been put in place to monitor the effectiveness or otherwise of the action that your Department has taken?
Mr Muir
Thank you, Patsy. A range of monitoring takes place on the lough. There is a dashboard available so that people can see that, and it is important that people have access to that information. Fundamentally, however, we need to address the pollution. That is why we have gone out to consult on a revised nutrients action programme, and it is why I seek enhanced regulation and enforcement against sewage pollution, which will end the bye ball that has wrongly been afforded to NI Water. Alongside that, we need to have stronger fines and penalties. I am progressing the legislation, but we also need an independent environmental protection agency. As you know, that has been vetoed by one party. It is a shining example of why there must be reform of the institutions. It is an affront to democracy that an independent environmental protection agency cannot proceed because one party does not like it.
Mr Speaker
We move on to topical questions.
View on the NI Assembly website (AQO 3869/22-27) (opens in a new tab)Official Report for AQO 3869/22-27 (opens in a new tab)
To ask the Minister of Health to detail a list of unused and underused properties in the health service estate in the (i) Lagan Valley constituency; and (ii) Lisburn and Castlereagh City Council area.
As of 31 March 2026:
| Constituency/ Council | Unused/ Underused | Site | Property |
| (i) & (ii) | Unused | N/A | Lisburn Health Centre |
| (ii) | Unused | Forster Green Hospital | Main Building |
| (ii) | Unused | Knockbracken Healthcare Park | Boiler House |
| (ii) | Unused | Knockbracken Healthcare Park | Divis |
| (ii) | Unused | Knockbracken Healthcare Park | Singing Kettle |
| (ii) | Unused | Knockbracken Healthcare Park | Inver Building |
| (ii) | Unused | Knockbracken Healthcare Park | Lagan Villa |
| (ii) | Unused | Knockbracken Healthcare Park | Maine |
| (ii) | Unused | Knockbracken Healthcare Park | Moy |
| (ii) | Unused | Knockbracken Healthcare Park | Piney Ridge/Wyndhurst |
| (ii) | Unused | Knockbracken Healthcare Park | Slemish |
| (ii) | Unused | Knockbracken Healthcare Park | Water Tower |
| (ii) | Unused | Knockbracken Healthcare Park | Glen Villa DoH Retained Estate |
| (ii) | Unused | Knockbracken Healthcare Park | Surplus DoH Retained Estate (c.80 acres) |
View on the NI Assembly website (AQW 50292/22-27) (opens in a new tab)
To ask the First Minister and deputy First Minister for an update on plans for the Maze-Long Kesh development site.
No decisions have yet been taken regarding the future of the site.
View on the NI Assembly website (AQW 50291/22-27) (opens in a new tab)
To ask the Minister for Infrastructure, pursuant to AQW 18182/22-27, for an update on the timescale for the planned development and opening of the proposed Lisburn West station.
As Minister for Infrastructure, I remain supportive of initiatives that have the potential to improve public transport connectivity and encourage greater use of the rail network.
The proposed Lisburn West station remains under development, and my Department continues to engage with Translink on the project. The Department has already provided £1.8m to Translink to progress the project.
However, it is not possible at this stage to provide a definitive timetable for the delivery or opening of the station.
Investment priorities will continue to be considered as part of future budget and capital planning processes.
View on the NI Assembly website (AQW 50290/22-27) (opens in a new tab)
To ask the Minister for the Economy to detail any plans that are in place to improve complementarity between the higher education and further education sectors in Northern Ireland to increase the number of further education students gaining places on undergraduate courses in Northern Ireland’s universities.
Further Education (FE) colleges provide accessible and flexible pathways into Higher Education (HE) through the delivery of Foundation Degrees, Higher National Diplomas and Certificates, and Higher Level Apprenticeships.
As part of the FE Fit for the Future Programme, work is ongoing to review the FE curriculum to strengthen progression pathways and reduce barriers to higher-level study.
#I also recently consulted on a review of the approach to widening participation in HE which recognises the role of FE colleges, including their involvement in the Widening Participation (WP) Forum.
View on the NI Assembly website (AQW 50289/22-27) (opens in a new tab)
To ask the Minister for the Economy to detail whether (i) consideration of funding for skills support is directed to the most disadvantaged in our society; and (ii) a impact assessment has been made on the implications of cutting the skills budget.
i) yes
ii) appropriate impact assessments will be conducted once a budget is in place.
View on the NI Assembly website (AQW 50146/22-27) (opens in a new tab)
To ask the Minister for the Economy whether she has been made aware that the proposed increase of three per cent in salaries for further education lecturers falls short of the proposal to increase teachers’ salaries by four per cent, in similar roles, resulting in a greater divergence in salary levels, contrary to stated policy.
Further Education (FE) colleges, as employers, are responsible for terms and conditions, including pay, for their lecturers.
Over the last 2 years lecturers’ pay has increased by around 10.6% overall, comprising a 6.6% increase in 2024/25 and a further 4% increase in 2025/26.
One of the conditions FE colleges, as employers, agreed as part of their 2024/25 and 2025/26 lecturers’ pay settlement with Trade Union Side (TUS) was to undertake a review of teacher pay scale parity in 2025/26, including the presentation of a business case to my Department.
I am advised by the FE Colleges’ Employers Forum (CEF) that the review is currently underway in line with the pay condition and a business case is under development.
View on the NI Assembly website (AQW 50145/22-27) (opens in a new tab)